Go Back  RCU Forums > RC Airplanes > Giant Scale Aircraft - 3D & Aerobatic > JTEC / RADIOWAVE Support
Reload this Page >

40% Extra 300 Construction by-the-numbers

Notices
JTEC / RADIOWAVE Support Get all your questions regarding JTEC/RADIOWAVE products answered here!

40% Extra 300 Construction by-the-numbers

Old 04-05-2006, 10:38 PM
  #1  
Don Szczur
Thread Starter
My Feedback: (1)
 
Don Szczur's Avatar
 
Join Date: Jan 2002
Location: Chantilly, VA
Posts: 2,163
Likes: 0
Received 14 Likes on 13 Posts
Default 40% Extra 300 Construction by-the-numbers

Several have asked for this kind of "by the numbers" thread for building the Extra 300- to supplement the PAK instruction booklet.

After reading the instructions several times through, construction started.

With the front bulkhead on the 300 now full size one uses the edge of a table to get the engine compartment aligned while gluing. I used the wood glue for construction of the box. Several clamps in place.

Al, forgive me. While visiting my father two weekends ago, we did some engineering. Three engineers around the table talking about statics. My sister came down and gave us her input. We are all EE's but still remember our statics enough to give it a shot. The results are 1/4 lb off of the engine box sides. Holed drilled then a band saw to take out the triangles and center area of the box sides. This was carefully done. The model was tested somewhat in the prototype, which had equal amounts of material in the front- wing tube mount area as this new one.

The fuselage sides were assembled per instructions The 1x1x72 inch aluminum triangles were purchased at Lowe's. The fuselages were joined and doubler added. A scrap 3/8 inch piece was spaced for top and bottom of the fuselage joining point. The 3/8 squares glued on the tops and bottoms with mostly wood glue, skipping about an inch every 6 to 8 inches and putting thick CA at those spots. THis allowed construction without delay of waiting for the wood glue to set.

Finally the vertical stringers were glued in with 3/8 inch square pieces, and the rear doubler glued into place.
Attached Thumbnails Click image for larger version

Name:	Ki20614.jpg
Views:	46
Size:	24.0 KB
ID:	439702   Click image for larger version

Name:	Hc91592.jpg
Views:	48
Size:	27.5 KB
ID:	439703   Click image for larger version

Name:	Ty64729.jpg
Views:	51
Size:	28.0 KB
ID:	439704   Click image for larger version

Name:	Sm29306.jpg
Views:	50
Size:	23.3 KB
ID:	439705   Click image for larger version

Name:	Uf50570.jpg
Views:	51
Size:	30.4 KB
ID:	439706   Click image for larger version

Name:	Br11978.jpg
Views:	50
Size:	22.9 KB
ID:	439707   Click image for larger version

Name:	Xz53646.jpg
Views:	62
Size:	22.1 KB
ID:	439708   Click image for larger version

Name:	Wu71226.jpg
Views:	65
Size:	23.0 KB
ID:	439709  

Click image for larger version

Name:	Zx42375.jpg
Views:	58
Size:	22.5 KB
ID:	439710  
Old 04-08-2006, 09:10 PM
  #2  
Don Szczur
Thread Starter
My Feedback: (1)
 
Don Szczur's Avatar
 
Join Date: Jan 2002
Location: Chantilly, VA
Posts: 2,163
Likes: 0
Received 14 Likes on 13 Posts
Default RE: 40% Extra 300 Construction by-the-numbers

Mating the fusleage sides to the engine Box structure.
Attached Thumbnails Click image for larger version

Name:	Us54069.jpg
Views:	50
Size:	32.2 KB
ID:	441363   Click image for larger version

Name:	Ez82851.jpg
Views:	68
Size:	29.1 KB
ID:	441364   Click image for larger version

Name:	In27945.jpg
Views:	50
Size:	30.6 KB
ID:	441365   Click image for larger version

Name:	Lf94794.jpg
Views:	48
Size:	27.7 KB
ID:	441366  
Old 04-08-2006, 09:19 PM
  #3  
Don Szczur
Thread Starter
My Feedback: (1)
 
Don Szczur's Avatar
 
Join Date: Jan 2002
Location: Chantilly, VA
Posts: 2,163
Likes: 0
Received 14 Likes on 13 Posts
Default RE: 40% Extra 300 Construction by-the-numbers

I drew a center line down the center of the worktable (an unfinished door). Used a SMART LEVEL to double check how close the fuselages were (tops parallell). Basically if you use the long aluminum straight edge or 78 inch corner aluminum stock this ensures the fuselage front and back piece are glued together straight. A hint. When you splice two pieces of balsa 3/8 stock together for the longerons, glue them with the splice opposite the glued surface. Basically this makes a stronger joint. The plywood sides will flex in and out, but not top to bottom. I had to put a shim under the back of one side since the door was about 1/8 inch off on one side as compared to the other. When the front box is glued in place straight, the back of the fuselagee (rear) will come together perfectly.

I put the triangle 78 inch stock in the corners and then clipped the fuselage sides to them in a few spots. Then carefully cut top and bottom pieces so they were the same size. Then glued in the bottom pieces (F3 F4 and f5) The balsa cross-pieces (cut the top piece first then cut the bottom one to match it). This insures the fuselage is square.
Attached Thumbnails Click image for larger version

Name:	Ay75233.jpg
Views:	49
Size:	27.1 KB
ID:	441374   Click image for larger version

Name:	Vq50338.jpg
Views:	66
Size:	22.3 KB
ID:	441375   Click image for larger version

Name:	Ze85697.jpg
Views:	46
Size:	25.8 KB
ID:	441376   Click image for larger version

Name:	Au56673.jpg
Views:	61
Size:	24.1 KB
ID:	441377   Click image for larger version

Name:	Sd43758.jpg
Views:	40
Size:	24.0 KB
ID:	441378   Click image for larger version

Name:	Iy36409.jpg
Views:	48
Size:	29.5 KB
ID:	441379  
Old 04-08-2006, 09:25 PM
  #4  
Don Szczur
Thread Starter
My Feedback: (1)
 
Don Szczur's Avatar
 
Join Date: Jan 2002
Location: Chantilly, VA
Posts: 2,163
Likes: 0
Received 14 Likes on 13 Posts
Default RE: 40% Extra 300 Construction by-the-numbers

As you can see above, before gluing in F3, F4 and F5 (the bottom bulkheads), first put the tailwheel plate in, and then a small piece of balsa at the rear of the fuselage. This rectangular piece was 1 1/2 inches wide. Taking in consideration two 3/8 squares pieces and the 1/8 inch fuselage sides, this put the rear of the fuselage at 2 1/2 inches per the plans.

There were a lot of triangles in the kit. Lay them out by size. They go in front and back of each of the forward three bulheads, and around the engine box. As you can see I took a hole saw and put a few lighening holes in the back area as well.
Attached Thumbnails Click image for larger version

Name:	By76583.jpg
Views:	56
Size:	29.5 KB
ID:	441388   Click image for larger version

Name:	Pl32190.jpg
Views:	65
Size:	23.2 KB
ID:	441389   Click image for larger version

Name:	Kp33633.jpg
Views:	47
Size:	25.7 KB
ID:	441390   Click image for larger version

Name:	Uo35588.jpg
Views:	46
Size:	25.7 KB
ID:	441391   Click image for larger version

Name:	My25297.jpg
Views:	48
Size:	23.0 KB
ID:	441392   Click image for larger version

Name:	Lc48663.jpg
Views:	57
Size:	27.3 KB
ID:	441393  
Old 04-08-2006, 09:28 PM
  #5  
Don Szczur
Thread Starter
My Feedback: (1)
 
Don Szczur's Avatar
 
Join Date: Jan 2002
Location: Chantilly, VA
Posts: 2,163
Likes: 0
Received 14 Likes on 13 Posts
Default RE: 40% Extra 300 Construction by-the-numbers

I put the wing and stab tubes in place and checked alignment. It was very close. The triangle stock has to be shaped when going in the corners around the engine box and the fuselage sides. I put wood glue in the corner and a few drops of CA on the edges of each triangle. The CA set quickly while allowing the white glue to dry.
Attached Thumbnails Click image for larger version

Name:	Ki17986.jpg
Views:	53
Size:	27.3 KB
ID:	441397   Click image for larger version

Name:	Fa85237.jpg
Views:	51
Size:	22.6 KB
ID:	441398   Click image for larger version

Name:	Qv55701.jpg
Views:	62
Size:	26.5 KB
ID:	441399   Click image for larger version

Name:	Au57656.jpg
Views:	64
Size:	27.3 KB
ID:	441400   Click image for larger version

Name:	It98155.jpg
Views:	69
Size:	29.0 KB
ID:	441401   Click image for larger version

Name:	Jz40065.jpg
Views:	60
Size:	30.8 KB
ID:	441402  
Old 04-08-2006, 09:36 PM
  #6  
Don Szczur
Thread Starter
My Feedback: (1)
 
Don Szczur's Avatar
 
Join Date: Jan 2002
Location: Chantilly, VA
Posts: 2,163
Likes: 0
Received 14 Likes on 13 Posts
Default RE: 40% Extra 300 Construction by-the-numbers

After I put the stringers in, then I put the diagonal- cross pieces in. They are staggered so the top and bottoms cross opposite. I went ahead and built a pipe tunnel out of light 3/32 balsa in case I go with long tuned pipes. Marco Benincasa did this at the Tuscon Shoot Out last year and I was really impressed with his power setup. I heard that the long pipes make the idle a bit tempermental, but since there are no tailslides at the Don Lowe Masters, this should be no problem. I had to remove the center of bottom bulhead to make room for the pipe tunnel. Will put the rudder servo tray up higher to clear the pipe tunnel.
Attached Thumbnails Click image for larger version

Name:	Qn38155.jpg
Views:	57
Size:	33.9 KB
ID:	441418   Click image for larger version

Name:	Rm38894.jpg
Views:	56
Size:	31.2 KB
ID:	441419   Click image for larger version

Name:	Fk17590.jpg
Views:	47
Size:	29.8 KB
ID:	441420   Click image for larger version

Name:	Ic84440.jpg
Views:	51
Size:	36.1 KB
ID:	441421   Click image for larger version

Name:	Xi60308.jpg
Views:	46
Size:	36.6 KB
ID:	441422   Click image for larger version

Name:	Qh66585.jpg
Views:	62
Size:	31.3 KB
ID:	441423   Click image for larger version

Name:	Xz52430.jpg
Views:	66
Size:	27.7 KB
ID:	441424   Click image for larger version

Name:	Ba90564.jpg
Views:	47
Size:	29.9 KB
ID:	441425  

Old 04-10-2006, 11:42 PM
  #7  
Don Szczur
Thread Starter
My Feedback: (1)
 
Don Szczur's Avatar
 
Join Date: Jan 2002
Location: Chantilly, VA
Posts: 2,163
Likes: 0
Received 14 Likes on 13 Posts
Default RE: 40% Extra 300 Construction by-the-numbers

Some additional pictures of the pipe tunnel.

Canopy deck. Make sure you allow 1/8 inch overlap for the two 3/8 inch side stringers. I glued the bottom 3/8 inch side stringers on, placed the canopy on the airplane, then glued the front three bulkhead/formers in place. I used a clothespin to clamp to the front fuselage bulkhead. Next is to mount the ply mounting tabs (its easier to get to them before sheeting the top of the canopy deck).
Attached Thumbnails Click image for larger version

Name:	Wu61833.jpg
Views:	45
Size:	30.5 KB
ID:	443167   Click image for larger version

Name:	Xs59280.jpg
Views:	44
Size:	28.5 KB
ID:	443168   Click image for larger version

Name:	Fk17016.jpg
Views:	50
Size:	26.0 KB
ID:	443169  
Old 04-19-2006, 12:14 AM
  #8  
Don Szczur
Thread Starter
My Feedback: (1)
 
Don Szczur's Avatar
 
Join Date: Jan 2002
Location: Chantilly, VA
Posts: 2,163
Likes: 0
Received 14 Likes on 13 Posts
Default RE: 40% Extra 300 Construction by-the-numbers

Rough assemble the canopy deck. Glue in the formers. Now, what angle do you put the rear former? Align the rear former so it's parallel to the back deck. It does not have to be exact. Just close enough so you can glue in the stringers in place.

The sheeting was straight forward. Cut two pieces, glue them together with some thick CA. Immediately sand the joint with a sanding block, then flip it over and sand the other side. I cut about 1/2 inch off each at the rear, tapering up to the front. That way the side pieces glued in are at about the right angle to fit on the canopy deck. See pictures. I put a litle water on the underside of the sheeting and set it on top of the deck, with some books on each side, to help shape it generally to the frame.
Attached Thumbnails Click image for larger version

Name:	Zx72220.jpg
Views:	47
Size:	27.4 KB
ID:	447707   Click image for larger version

Name:	Lg17052.jpg
Views:	47
Size:	22.2 KB
ID:	447708   Click image for larger version

Name:	Gl20748.jpg
Views:	51
Size:	31.8 KB
ID:	447709   Click image for larger version

Name:	Ke90544.jpg
Views:	45
Size:	16.7 KB
ID:	447710   Click image for larger version

Name:	Ju12579.jpg
Views:	63
Size:	17.8 KB
ID:	447711   Click image for larger version

Name:	Lc48210.jpg
Views:	47
Size:	19.7 KB
ID:	447712  
Old 04-19-2006, 12:19 AM
  #9  
Don Szczur
Thread Starter
My Feedback: (1)
 
Don Szczur's Avatar
 
Join Date: Jan 2002
Location: Chantilly, VA
Posts: 2,163
Likes: 0
Received 14 Likes on 13 Posts
Default RE: 40% Extra 300 Construction by-the-numbers

The next step is to glue the sheeting to the deck, trim the edges, then position it. Before gluing on the sheeting, I will mount the tabs for the six 6x32 cap screws and mounts. Its easier to get to them before its sheeted. Finally once everything is positioned, one can glue on the back deck to get a clean interface with canopy deck.
BTW. I glued the 1/8 x 3/8 pieces to the underside of the rear deck pieces, added additional 1/16 pieces to fill the rest of the gap, only to find that I had to trim about 1/32 off the front and back for a flat mating surface (flat with the tops of the fuselage sides). A little sanding and it fit very well.
Old 04-22-2006, 07:37 PM
  #10  
Don Szczur
Thread Starter
My Feedback: (1)
 
Don Szczur's Avatar
 
Join Date: Jan 2002
Location: Chantilly, VA
Posts: 2,163
Likes: 0
Received 14 Likes on 13 Posts
Default RE: 40% Extra 300 Construction by-the-numbers

Canopy deck sticks are glued in, then the 6 tabs for the mounting blind nuts. A 3/8 spacer is glued in at each location. Finally sheeting is glued on. Make sure you sheet on a flat surface so the deck will not warp. I used wood glue for the stringers and then thick CA on the edges. After wetting the balsa on the outside, it provides for bending of the bala at the bottom part.
Attached Thumbnails Click image for larger version

Name:	Fd91396.jpg
Views:	51
Size:	24.0 KB
ID:	449646   Click image for larger version

Name:	Wr55547.jpg
Views:	58
Size:	21.2 KB
ID:	449647   Click image for larger version

Name:	Yd81570.jpg
Views:	63
Size:	19.1 KB
ID:	449648   Click image for larger version

Name:	Zt52760.jpg
Views:	52
Size:	27.6 KB
ID:	449649   Click image for larger version

Name:	Qb36382.jpg
Views:	44
Size:	27.5 KB
ID:	449650   Click image for larger version

Name:	Lc49322.jpg
Views:	54
Size:	21.3 KB
ID:	449651  
Old 04-22-2006, 07:42 PM
  #11  
Don Szczur
Thread Starter
My Feedback: (1)
 
Don Szczur's Avatar
 
Join Date: Jan 2002
Location: Chantilly, VA
Posts: 2,163
Likes: 0
Received 14 Likes on 13 Posts
Default RE: 40% Extra 300 Construction by-the-numbers

For the rear deck, push it up against the canopy deck and draw a mark for the location. Remove the canopy deck and glue on the rear deck. I used wood glue on the inside and some CA on the outside edge. I started with one side, pushed down and aligned the side with the fuselage side. THen I put CA on the other outside edge (the deck will lift up a little on the other side to get the glue in. Then press that side down so its aligned with the fuselage side. Finally glue the front and rear ply formers in place and then put balsa sheeting across the front of hte deck.
Attached Thumbnails Click image for larger version

Name:	Us54506.jpg
Views:	57
Size:	19.1 KB
ID:	449657   Click image for larger version

Name:	Up46964.jpg
Views:	47
Size:	23.0 KB
ID:	449658   Click image for larger version

Name:	Bg92485.jpg
Views:	50
Size:	28.7 KB
ID:	449659   Click image for larger version

Name:	Oh13247.jpg
Views:	51
Size:	28.4 KB
ID:	449660   Click image for larger version

Name:	Ju13431.jpg
Views:	69
Size:	28.1 KB
ID:	449661   Click image for larger version

Name:	Ja42670.jpg
Views:	80
Size:	24.0 KB
ID:	449662  
Old 04-22-2006, 10:52 PM
  #12  
Don Szczur
Thread Starter
My Feedback: (1)
 
Don Szczur's Avatar
 
Join Date: Jan 2002
Location: Chantilly, VA
Posts: 2,163
Likes: 0
Received 14 Likes on 13 Posts
Default RE: 40% Extra 300 Construction by-the-numbers

Gluing the rudder fin was easy. First step was to glue the vertical post, then the fin. Note the center line at the top of the fin. This enabled a straight mount with respect to the centerline. Sight down the line with a 1 meter ruler and it give a pretty good alignment. The balsa and foam pieces were cut perfectly and I only had to sand a little to take any gaps out. Finally do the fillet sheeting. Use some paper (folded around the fuselage curve) to make a paper template, cut out the balsa pieces and glue them in place with CA. I sanded an angle (from none to a very strong taper at the back part of the sheeting pieces. That way it fit flush against the fin sheeting sides. I used a couple of 3/8 inch cross pieces to secure the fin, and the second 1/8 ply piece gave the sheeting the correct spacing to glue to so its flush with the back deck. Some sanding with a block and some 80 grit and it looks great.
Attached Thumbnails Click image for larger version

Name:	Ay76059.jpg
Views:	46
Size:	27.8 KB
ID:	449774   Click image for larger version

Name:	Rm36483.jpg
Views:	45
Size:	27.1 KB
ID:	449775   Click image for larger version

Name:	Jo29909.jpg
Views:	45
Size:	21.6 KB
ID:	449776   Click image for larger version

Name:	Le92767.jpg
Views:	49
Size:	22.5 KB
ID:	449777   Click image for larger version

Name:	Ep85989.jpg
Views:	48
Size:	20.9 KB
ID:	449778   Click image for larger version

Name:	Gw29780.jpg
Views:	49
Size:	19.8 KB
ID:	449779   Click image for larger version

Name:	Ce71975.jpg
Views:	58
Size:	21.6 KB
ID:	449780  
Old 04-30-2006, 10:19 PM
  #13  
Don Szczur
Thread Starter
My Feedback: (1)
 
Don Szczur's Avatar
 
Join Date: Jan 2002
Location: Chantilly, VA
Posts: 2,163
Likes: 0
Received 14 Likes on 13 Posts
Default RE: 40% Extra 300 Construction by-the-numbers

Here is the template I made for the rear fuselage sides where they come together at the vertical fin. The balsa is 1/2 inch light weight.

Don
Attached Thumbnails Click image for larger version

Name:	Yv66046.jpg
Views:	60
Size:	104.8 KB
ID:	453473  
Old 04-30-2006, 10:20 PM
  #14  
Don Szczur
Thread Starter
My Feedback: (1)
 
Don Szczur's Avatar
 
Join Date: Jan 2002
Location: Chantilly, VA
Posts: 2,163
Likes: 0
Received 14 Likes on 13 Posts
Default RE: 40% Extra 300 Construction by-the-numbers

1/8 inch light weight sheeting, that is.

Don
Old 05-03-2006, 09:11 AM
  #15  
al
 
al's Avatar
 
Join Date: Sep 2003
Location: mooresville, NC
Posts: 312
Likes: 0
Received 0 Likes on 0 Posts
Default RE: 40% Extra 300 Construction by-the-numbers

Don,

Thanks for doing the thread. The plane is looking great, Can't wait to see it

Al
Old 08-02-2006, 10:32 PM
  #16  
Don Szczur
Thread Starter
My Feedback: (1)
 
Don Szczur's Avatar
 
Join Date: Jan 2002
Location: Chantilly, VA
Posts: 2,163
Likes: 0
Received 14 Likes on 13 Posts
Default RE: 40% Extra 300 Construction by-the-numbers

Took a break from building and flew some pattern over the last couple months. I got the other one in the air for a few spins. I've put the new kit back on the workbench. Need to determine final engine and pipe configuration, complete mounting the elevators, surmise any other mods, take dihedral out, and then prepare for covering. Pictures courtesy of Xavior.
Attached Thumbnails Click image for larger version

Name:	Gd93568.jpg
Views:	63
Size:	23.8 KB
ID:	500962   Click image for larger version

Name:	Av68146.jpg
Views:	50
Size:	21.8 KB
ID:	500963   Click image for larger version

Name:	Fl18321.jpg
Views:	52
Size:	26.8 KB
ID:	500964   Click image for larger version

Name:	Bv59800.jpg
Views:	54
Size:	27.8 KB
ID:	500965   Click image for larger version

Name:	Ep85882.jpg
Views:	48
Size:	26.6 KB
ID:	500966   Click image for larger version

Name:	Fw27000.jpg
Views:	64
Size:	27.3 KB
ID:	500967  
Old 08-03-2006, 11:18 PM
  #17  
Don Szczur
Thread Starter
My Feedback: (1)
 
Don Szczur's Avatar
 
Join Date: Jan 2002
Location: Chantilly, VA
Posts: 2,163
Likes: 0
Received 14 Likes on 13 Posts
Default RE: 40% Extra 300 Construction by-the-numbers

I decided to take the dihedral out. Below pictures are self explanatory. The process took about 2 hours this evenng and its about ready to glue. I suppose that I'll pick up some expanding foam stuff to fill in the gap. The process started by shoving some wire on the bottom part of the tube/foam interface and working the tube so it came to the middle of the center root rib. Cut out a small portion of the center rib and then made a light ply piece for the center area to strengthen it.
Attached Thumbnails Click image for larger version

Name:	Ki18780.jpg
Views:	43
Size:	23.6 KB
ID:	501428   Click image for larger version

Name:	Bw73303.jpg
Views:	45
Size:	23.5 KB
ID:	501429   Click image for larger version

Name:	Jo29578.jpg
Views:	68
Size:	28.8 KB
ID:	501430  
Old 08-03-2006, 11:35 PM
  #18  
Don Szczur
Thread Starter
My Feedback: (1)
 
Don Szczur's Avatar
 
Join Date: Jan 2002
Location: Chantilly, VA
Posts: 2,163
Likes: 0
Received 14 Likes on 13 Posts
Default RE: 40% Extra 300 Construction by-the-numbers

Some additional pictures of the technique.
Attached Thumbnails Click image for larger version

Name:	Ay74364.jpg
Views:	57
Size:	23.7 KB
ID:	501431   Click image for larger version

Name:	Ql34571.jpg
Views:	61
Size:	26.5 KB
ID:	501432   Click image for larger version

Name:	Uz67928.jpg
Views:	46
Size:	24.2 KB
ID:	501433   Click image for larger version

Name:	Bu58473.jpg
Views:	46
Size:	23.7 KB
ID:	501434   Click image for larger version

Name:	Hs95209.jpg
Views:	41
Size:	28.2 KB
ID:	501435  
Old 08-04-2006, 06:55 PM
  #19  
vatechguy3
My Feedback: (11)
 
Join Date: Apr 2002
Location: Smithfield, VA
Posts: 1,056
Likes: 0
Received 0 Likes on 0 Posts
Default RE: 40% Extra 300 Construction by-the-numbers

why not cut a new root rib with the tube hole correctly located for the 0 dihedral??
wouldn't that be stronger than adding a lite ply plate?

tony
Old 08-05-2006, 10:52 PM
  #20  
Don Szczur
Thread Starter
My Feedback: (1)
 
Don Szczur's Avatar
 
Join Date: Jan 2002
Location: Chantilly, VA
Posts: 2,163
Likes: 0
Received 14 Likes on 13 Posts
Default RE: 40% Extra 300 Construction by-the-numbers

The lite ply plate doubler, plus adding the filler piece in should be approximately 2X as strong as just the root rib, plus the kit pieces are laser cut. I could not get another set of root ribs cut/drilled as accurately. This really is the straightest kit I've seen. I could not detect anything out of alignment, or even the slightest warp in the wings, stabs, or rudder. I'm almost afraid to do the finishing sanding on the wings and stab to mess up the perfect surfaces.

A disclaimer. I do not recommend these wing modifications from the standard kit under normal circumstances. I am testing to see if this will make a great flying airplane even better. The only place I expect to see a difference is in the 1 roll circle and rolling loop maneuvers.

Don
Old 09-02-2006, 09:49 PM
  #21  
Don Szczur
Thread Starter
My Feedback: (1)
 
Don Szczur's Avatar
 
Join Date: Jan 2002
Location: Chantilly, VA
Posts: 2,163
Likes: 0
Received 14 Likes on 13 Posts
Default RE: 40% Extra 300 Construction by-the-numbers

Landing gear.

All items carefully weighed. Landing gear is 7 oz lighter. Small 3/4 inch aluminum stock was subsituted for the 1 1/2 inch stock. The carbon gear is 1/2 inch wider at the base and 2 inches more spread. Aluminum channel and small aluminum stock alternated.

Engine box dimensions for mounting a DA 150 are as follows: 9 3/4 inch front of the firewall to the first bulkhead on the left side, and 9 3/8 inch from the left side. The engine is offset approximately 2 inches to the left and the engine holes are 5/8 inch from the top of the engine box. Attached are some pictures that may be helpful.

Started to sand the fuselage. I hope to take approximately 1.5 oz off by sanding. The 1/8 inch sheeting will hopefully be sanded down to about 3/32 to 1/16.
Attached Thumbnails Click image for larger version

Name:	Ig11556.jpg
Views:	51
Size:	71.1 KB
ID:	517928   Click image for larger version

Name:	Ni22457.jpg
Views:	58
Size:	68.8 KB
ID:	517929   Click image for larger version

Name:	In26309.jpg
Views:	48
Size:	78.3 KB
ID:	517930   Click image for larger version

Name:	Dx67788.jpg
Views:	58
Size:	75.3 KB
ID:	517931   Click image for larger version

Name:	Uf51674.jpg
Views:	63
Size:	81.8 KB
ID:	517932   Click image for larger version

Name:	Ev23508.jpg
Views:	47
Size:	77.1 KB
ID:	517933  
Old 09-11-2006, 05:36 PM
  #22  
Don Szczur
Thread Starter
My Feedback: (1)
 
Don Szczur's Avatar
 
Join Date: Jan 2002
Location: Chantilly, VA
Posts: 2,163
Likes: 0
Received 14 Likes on 13 Posts
Default RE: 40% Extra 300 Construction by-the-numbers

I used heat -resistant paint for the pipe area. These are Greve pipes.
Attached Thumbnails Click image for larger version

Name:	Fc90229.jpg
Views:	63
Size:	13.8 KB
ID:	522617  
Old 09-12-2006, 11:56 PM
  #23  
Don Szczur
Thread Starter
My Feedback: (1)
 
Don Szczur's Avatar
 
Join Date: Jan 2002
Location: Chantilly, VA
Posts: 2,163
Likes: 0
Received 14 Likes on 13 Posts
Default RE: 40% Extra 300 Construction by-the-numbers

The zero dihedral wing resulted in just a little bit of opposite aileron and up elevator mix with rudder (3 to 5 % each) but more importantly the yaw is very linear across the full spectrum of maneuvers, to include 3D knife edge.

Weight measured as follows- ready to fly less fuel:

Left wing 3Lbs 11 oz
Right wing 3 Lbs 10.6 oz
Wing tube 14.8 oz (CF)
Canopy/deck 1 Lb 12.8oz
Elevators and stab tube (CF) 1 Lb 13.6 oz
Spinner 9.2 oz (non-lightened backplate)
Prop/hub 1Lb 4.4 oz
Fuselage 25 Lbs, 0.4 oz

Total weight if I added this up correctly is basically 38 3/4 Lbs. This is significantly lighter than what I was expecting.

The airplane flies totally different from the existing Extra 300 I'm flying. This is mostly due to the lighter weight, additional servo per aileron side, zero dihedral. Results have been very favorable so far.
Old 09-13-2006, 08:14 AM
  #24  
DMichael
My Feedback: (5)
 
Join Date: Nov 2002
Location: Laurel, MD
Posts: 976
Received 0 Likes on 0 Posts
Default RE: 40% Extra 300 Construction by-the-numbers

Don was gracious enough to give me a few minutes on this plane on flight #2.

Really nice flying plane. As Don notes, the removal of dihedral improves flying characteristics but I think it also looks better. In the few minutes I flew it some things that stuck out to me were:

Nice slow downlines. I assume it is because it is a sizable plane and under 39lbs
Rolls great.
Snaps are easy- I was able to hit snaps right away.
I felt very comfortable with it more quickly than any other plane I have flown, including my own.

It looks to me like this plane is a real winner.

Dave Michael
Old 09-14-2006, 04:31 PM
  #25  
T. Bob
Senior Member
My Feedback: (9)
 
T. Bob's Avatar
 
Join Date: Feb 2002
Location: Munster, IN
Posts: 1,550
Likes: 0
Received 0 Likes on 0 Posts
Default RE: 40% Extra 300 Construction by-the-numbers

Hey Don any finished pics?

Thanks

Thread Tools
Search this Thread

Contact Us - Manage Preferences Archive - Advertising - Cookie Policy - Privacy Statement - Terms of Service

Copyright © 2024 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.