Making gear doors functional, the main rear doors was a challenge but I think I got it working right and totally effortless just using a metal rod and some plastic swivel bracket, the front doors are not fully scale because the full size has 3 doors but this will make it easier and drag less .
Using the long weekend I was able to get more stuff done, all servos installed, air system 90% pipe installed, turbine placed, now playing with organizing equipment for the cg , probably no led needed just batteries and equipment
I know that this doesn’t look like much , but this took me so much time to figure where to install the turbine equipment and plan for the fuel pump and uat tank.